Kitchen during repair work with units removed and flooring exposed in Spilsby
Property Repair

Subsidence-Related Property Repairs in Spilsby

Spilsby, LincolnshireIn progress

Project status

The latest published position for this project.

Status16 October record: strip-out, structural crack repairs and plaster preparation
Project Overview

A property repair project in Spilsby

Lee introduced this job as work connected with a subsidence claim. His 16 October update records kitchen removal, flooring strip-out and repairs to walls and finishes across the house. It is a record of the agreed building work, rather than a structural diagnosis or confirmation that the original ground movement has been resolved.

Repairing cracked areas

Lee described taking back plaster and opening mortar joints before installing resin and helical bars in the affected areas. Expanded metal lath mesh and scratch coats formed part of the preparation for a new plaster finish. The repair specification must relate to the particular property; these photographs are not a guide to treating cracks without assessment.

Issues found behind the finishes

Removing the kitchen and flooring exposed areas where a levelling compound had not adhered to the material below. Lee identified bituminous material that needed asbestos testing; no positive test result was provided in the filmed update. He also described finding plasterboard extending down to the floor and bridging the damp-proof course in an affected area.

Opened ceiling areas show the older construction and the preparation for replacement finishes. The photographs show work in progress and do not show a completed kitchen or finished repaired rooms.

Discussing repairs to an existing home

Explore building repair work and property renovations, or read the Spilsby repair walkthrough.

Tell LME about your property and request an initial site visit.

What we did

Kitchen removal and flooring strip-out for the repair work
Helical-bar and resin crack repairs described in Lee’s walkthrough
Expanded metal lath mesh and preparation for plaster finishes
Investigation of damp and adhesion problems uncovered during strip-out
Removal of affected lath-and-plaster ceiling areas

Project details

TypeProperty Repair
LocationSpilsby, Lincolnshire
StatusIn progress
Start a similar project
Related building services
Building Repairs & Impact-Damage Renovations→Complete Property Renovations in Lincolnshire→

Gallery

Kitchen during repair work with units removed and flooring exposed in Spilsby
Kitchen during repair work with units removed and flooring exposed. Photographed 16 October 2026.
Stripped wall finishes beside an internal doorway during repair work in Spilsby
Stripped wall finishes beside an internal doorway during repair work. Photographed 16 October 2026.
Opened ceiling area above an internal doorway showing timber and lath in Spilsby
Opened ceiling area above an internal doorway showing timber and lath. Photographed 16 October 2026.