Lee’s site update follows drainage at Plot Eight and patio and driveway preparation at Plot One of The Meadows in Leasingham.

Groundworks on a residential development continue beyond the first foundations. Drainage, access and the outside spaces around each home also need coordinating with the build. Lee’s filmed update from The Meadows in Leasingham shows these tasks happening at different ends of the same site.
The development comprises eight executive properties. This article follows the stages Lee described at Plot Eight and Plot One, alongside drone views of the wider development.
Drainage at the upper end of the site
At Plot Eight, the trenches were already dug and the team was installing the remaining drainage around the rear of the property into a chamber. Lee explained that this drainage continues down the site into a pumping station, then onward into the village.
That description gives context to the work taking place around one plot. The connection is part of a wider site route, rather than an isolated section of pipe serving only the immediate work area.
The aerial photographs show the site layout and access. They do not expose the buried drainage or provide a drainage design; those details come from Lee’s commentary on the job.

Patio work outside the living spaces
At Plot One, the team had begun laying Indian sandstone paving at the rear of the house. Lee described the paved area extending outside the kitchen and living-room patio doors.
Positioning outside space around the rooms it connects to is part of understanding the whole property. Here, the patio work is being recorded while the external works are underway, rather than being presented as a finished landscaped garden.
Preparing the driveway and entrance
Lee also outlined the next stage at Plot One: digging off the driveway area, putting in the gate pillars and preparing for block paving. These were planned tasks at the time of filming. The drone views show the house frontage and ground preparation, providing a useful reference for a later finished-work update.

Different plots, different stages
One of the useful things about this update is the contrast between the plots. At one end, the team is connecting drainage; at the other, paving has started and driveway preparation is next. A development does not need every plot to reach the same task at the same moment.
This is why a project record benefits from identifying the plot and the stage shown. It helps distinguish the work already recorded from what is planned, and makes later progress easier to follow.

Discussing a similar development
When approaching LME about a development, describe the number of plots, the current construction stage and the work you want the team to undertake. Existing drawings and information about drainage, access and external finishes help establish the proposed scope.
See The Meadows project gallery, explore groundworks and foundations in Lincolnshire and residential development construction, or read what affects a development programme.
Discuss your building project with LME.
Find out more about groundworks & foundations across Lincolnshire — see our services →